Boonton Bridge Inspection

Today, Tuesday, 30 April, the PKB Engineering crew inspected the Grace Lord Park / Rockaway River RR bridge.  LHRy is funding the work which will produce an evaluation of current condition, current load rating analysis and recommendations for upgrades.  They did a thorough inspection of the two 1897 truss sections and the two 1890 deck girder sections.